The Amel 46 Maramu sailboat is a large cruising monohull, built by the Amel shipyard. This ketch-rigged sailboat was designed by the naval architect...
The sailboat **Amel 46 Maramu** is a cruising monohull built by the **Amel** yard. This ketch-rigged vessel, designed by naval architect **Henri Amel**, measures 13.8 meters in length. Production started in 1978 and ended in 1989. A total of 288 units were produced. Visible in the Bay of ROSAS, Spain
Engine: PERKINS 4154 Fixed original Power: 58 HP actual – 10 HP Fiscal Hours: 4580 hours Alternators: 1 engine 1 service 1 on propeller shaft
Standing rigging 2018 Running rigging 2018 Mast: full treatment and varnishing 2018 Bonnet: full treatment and varnishing 2018 Boats. supports: full treatment and varnishing 2018
Sails : Main sail good condition 2015 on electric mast roller Genoa very good condition 2018 on electric roller Jib very good condition 2018 on simple roller 2018 Jib boom good condition 2015 on mast roller Port and starboard stays complete 2 winches, one electric
Electronics completely refurbished in 2018 VHF ASN B&G V20 2018 +1 mobile AIS B&G NAIS 500 2018 GPS 2018 +1 mobile SART COSPA OCEAN SIGNAL RESCUE ME EPIRB 2018
Navigation center TRITON 2 2018 Digital display 3 on cockpit 2018 Depth sounder B&G 2018 Log B&G 2018 Wind vane B&G 2018 Anemometer B&G 2018 Antennae 2018 All sent to : Vulcan 7 plotter B&G 2018 NAVIONICS 43 AND 46 XG charts 2018 Atlantic Europe and Mediterranean FURUNO 9 PAN M 1800 radar
Electricity : Electrical system: batteries: 1 Engine 2022 5 Service 2022 Charger - inverter 2023 12V panel, 220V panel + control panel 55 W solar panel on arch Wind turbine on arch
USB equipment on chart table and in cockpit 2022
Interior equipment : Original interior layout, varnished wood in very good condition 2-burner stove with oven 12V refrigerator 2022 Amel "freezer" set Regulatory fire extinguishers 2018 7 berths + 1 child 2 separate cabins 2 bathrooms: with sinks, showers, and toilets Standard chart table setup, rule, compass, takedown ... Paper charts of the Mediterranean and Atlantic coast
Work carried out on this boat since acquisition at the end of 2017 :
- Full keel treatment 2018 - Stripping - Anti-corrosion treatment - Marine painting - Full hull lifting 2018 - Removal and complete overhaul of the engine in workshop with replacement of all peripheral parts 2018 - Complete replacement of standing rigging 2018 - Complete replacement of running rigging 2018 - Addition of a second stay for the jib on roller 2018 - Mast and boom removal: 2018 - Stripping - Anti-corrosion treatment - Varnishing - Replacement of the cockpit glass protections 2018 - Complete marine textile cockpit cover 2018 - Refrigerator replacement 2022 - Replacement of the black water system 2022 - Forward toilet replacement 2018 - Tank cleaning 2018 - Careening every two years (semi-erosion resistant) 2018 - 2020