Beautiful yacht with flying bridge. Fully equipped and completely renovated in 2023. This Leopard-88 is a 26.60 m motor yacht with a flying bridge...
Very beautiful Yacht with flying bridge.
Fully equipped and completely renovated in 2023.
This Leopard-88 is a 26.60 m motor yacht with a flying bridge in good condition, built in GRP by Cantieri Navali Arno in Italy and delivered in 2004, featuring a planing hull with teak decks. Powered by two MTU 2000 hp diesel engines, each driving conventional shafts, it cruises smoothly at 23 knots, reaching a top speed of up to 28 knots. The interior layout comfortably accommodates (10) guests in (4) cabins consisting of a master suite amidships, a VIP suite forward, a double cabin with single berths plus an additional Pullman berth, and a guest cabin with a French double bed, all with en-suite bathrooms. It can also accommodate (4) crew members in (2) cabins with facilities in separate quarters. The spacious cabins are complemented by large living areas both inside and outside.Very beautiful Yacht deal Powered by two MTU 2000 hp diesel engines, each driving conventional shafts, it cruises smoothly at 23 knots, reaching a top speed of up to 28 knots. The interior layout comfortably accommodates (10) guests in (4) cabins consisting of a master suite amidships, a VIP suite forward, a double cabin with single berths plus an additional Pullman berth, and a guest cabin with a French double bed, all with en-suite bathrooms. It can also accommodate (4) crew members in (2) cabins with facilities in separate quarters. The spacious cabins are complemented by large living areas both inside and outside.
RENOVATIONS
Hull repainted from blue to white
Maintenance carried out in 2023:
Main engines (MTU 16V2000M91)
Port engine fuel injectors removed for inspection and reinstallation.
Endoscopic examination of the combustion chamber performed to check cylinder liners and intake and exhaust valves (September).
Port engine bank B exhaust elbow disassembled for cleaning and inspection, including a cross-check due to a coolant leak (September).
Chemical cleaning and reinstallation of the oil coolers on both main engines (September).
Replacement of 2 turbochargers on main engines (2023).
Generator (Onan 27kw/60Hz)
Sea water pump and generator rotary pump system repaired and serviced (July)
Desalination system
High-pressure pump of the desalination system replaced (2023).
Air conditioning system
Fresh water pump of the air conditioning system replaced (May).
Fan coil motor of the crew cabin air conditioner replaced (September).
Grey water disposal system
Grey water pump replaced (June).
Anchor winches
Repair and maintenance of two anchor windlasses by Lofrans (July).
The Company offers the information related to this vessel in good faith but cannot guarantee the accuracy of this information or the condition of the vessel. It is the buyer’s responsibility to instruct their agents or experts to verify
and validate the information of their choice. This vessel is offered subject to prior sale.